E&LS Switching in Iron Mountain, Michigan

Posted by Wally Colegrove
After some interchange work with the CN at Quinnesec, the power switched from the CN branch onto the main, coupled back on to the rest of the train and proceeded north to Channing. This was during the lunch rush, so this must've been nerve-racking to the local citizens, especially since the 1221 blocked 2 lanes of traffic during this switch move! I waited two years to catch the E&LS in Iron Mountain, and I finally did. WOO HOO! Now on to my next challenge. Enjoy!
Posted April 30, 2012 - Filed in Entertainment - #SD9 GP38 
click to rate

Embed  |  332 views
0 comments